Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13740)           
UK only International

HawkinsBrown complete timber pool facility for 'swimming among the trees'

By Kim Megson    23 Nov 2017
The space has been designed as 'a welcoming retreat that engages with the mature woodland setting through the use of natural materials and colour schemes' / Jack Hobhouse
The deep columns of the all-timber construction and wrap around glazing, which afford direct views from the water into the woodland
– Adam Cossey, Partner at Hawkins\Brown

Architects HawkinsBrown have completed an elegant timber pool hidden among the trees for a school in the English county of Surrey.

Swimmers using the 25m, six-lane competition pool can view the surrounding woodland through a series of windows integrated into the building’s timber frame.

The architects used off-site fabrication methods to create the facility for Freemen’s School in the village of Ashtead, which replaces a previous pool building destroyed by a fire in 2014.

“The space is a welcoming retreat that engages with the mature woodland setting through the use of natural materials and colour schemes,” said HawkinsBrown partner Adam Cossey.

“The deep columns of the all-timber construction and wrap-around glazing afford direct views from the water into the woodland, giving the sense of swimming amongst the trees.”

Fit out contractor Gilbert-Ash worked on the project, forming the building’s glue-laminated timber (glulam) portal frame, which is braced with cross-laminated timber (CLT) panels. According to the design team, the choice of the material was made in response to the need for a fast, efficient, carbon-neutral method of construction and a building that is resilient, insulates and is resistant to corrosion.

To minimise its impact on the school’s Grade II-listed landscape, the lower ground floor is partially submerged, moulding the structure into the surrounding scenery. The highest point of the gently pitched roof identifies the main entrance.

Inside, the natural internal surface of the roof and walls are left exposed and stained white, acting as “a complementary feature to the external setting that helps to create a special environment to swim in".

The frame, walls and roof were completed in just over three weeks, with the interior pool, changing facilities and multi-purpose teaching and events space following. The entire project – built in collaboration with structural engineer Eckersley O’Callaghan, landscape designer BD Landscape and arboriculturalist TreeLine – was delivered in one year.

The swimming pool marks the second phase of a four-stage campus masterplan by the City of London, which HawkinsBrown is delivering for the school.

Completed in 2014, the first phase saw the delivery of a new music school and a boarding house for 60 pupils. Future plans include the refurbishment of the Grade II* Listed Main House, a new playground and enhancements to the landscaping of the school grounds.

A number of developers have started to see the potential of swimming pools situated in woodland sites. Projects in the pipeline include a green-roofed aquatic centre surrounded by trees on the west coast of France, designed by architects Agence Search, and a swimming and leisure facility in a tree-filled park in Derby, UK, designed by FaulknerBrowns.

Swimmers using the 25m, six lane competition pool can view the surrounding woodland through a series of windows integrated into the building’s timber frame / Jack Hobhouse
The architects used off-site fabrication methods to create the facility for Freemen’s School in the village of Ashtead / Jack Hobhouse
Inside, the natural internal surface of the roof and walls is left exposed and stained white, acting as “a complementary feature to the external setting' / Jack Hobhouse
Fit out contractor Gilbert-Ash worked on the project, forming the building’s glue-laminated timber (glulam) portal frame, which is braced with cross-laminated timber (CLT) panels / Jack Hobhouse
According to the design team, the choice of the material was made in response to the need for a fast, efficient, carbon neutral method of construction / Jack Hobhouse
The swimming pool marks the second phase of a four-stage campus masterplan by the City of London, which Hawkins\Brown is delivering for the school / Jack Hobhouse
Hawkins/Brown  timber construction  swimming pool  Freemen's School  Surrey  architecture  design  Adam Cossey 
Sign up for FREE ezines
Related news
Sports jobs

Duty Manager

The Pickaquoy Centre
Salary: £30,000pa + local Govt pension + attractive benefits package
Location: Kirkwall, UK

Team Leader (Harrow School Fitness Club)

Harrow School
Salary: £13.71 per hour
Location: Harrow on the Hill, Harrow, UK

Centre Manager (Leisure)

Exeter City Council
Salary: £40,221 - £42,403pa + pension + benefits
Location: Exeter, UK

Director of Operations

Active Luton
Salary: £61,000 - £64,000 + exceptional pension + excellent benefits
Location: Luton, UK

Fitness Motivator

Everyone Active
Salary: Competitive
Location: Lutterworth

Recreation Assistant/Lifeguard (NPLQ required)

Everyone Active
Salary: 9.50 ph
Location: Lutterworth

Membership Manager

University of Warwick
Salary: £29,605 - £32,982pa + pension + benefits
Location: Coventry, UK

Recreation Assistant

Everyone Active
Salary: Competitive salary
Location: Wigston

Swim Teacher

Everyone Active
Salary: Competitive
Location: Shipston-on-Stour
recruiting with sports management

Swim Teacher

Everyone Active
Salary: Competitive
Location: Shipston-on-Stour

Chief Executive Officer, Mount Batten Centre

Mount Batten Group
Salary: c£65,000pa + pension + benefits
Location: Plymouth, UK

Swim Teacher

Everyone Active
Salary: Competitive
Location: Basildon

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Rickmansworth, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Watford, UK
Swimming Teacher jobs  duty manager jobs  Team Leader jobs  recreation assistant jobs  Swim Manager jobs  general manager jobs 
More jobs

Company profile

Company profile: PSLT Ltd
PSLT Fitness Solutions manufacture, remanufacture and buy back commercial gym equipment. We supply and maintain gym equipment such as Precor, Technogym, Life Fitness and Matrix to a large number of leisure centres, fire services and local authorities.
View full profile >
More company profiles

Featured Supplier

Webinar: Building a new energy future for the leisure sector
As one of the most energy-intensive industries in the UK, leisure facilities face a critical challenge in balancing net zero goals, funding and increased costs.
View full details >
More featured suppliers

Property & Tenders

Location: Loughton, IG10
Company: Knight Frank
Location: Grantham, Leicestershire
Company: Belvoir Castle
Location: Verwood, Dorset
Company: AVISON YOUNG
Location: Hall Place House, Bexley, DA5 1PQ
Company: London Borough of Bexley
Location: 15 Concessions across the nation's forests
Company: Forestry England
More properties & tenders

Diary dates

22-24 Apr 2024
Galgorm Resort, York
10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
More diary dates