Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13966)           
UK only International

Asian Games kick off in Incheon

By Jak Phillips    19 Sep 2014
International sports specialists Populous designed the Incheon Asiad Main Stadium / Populous

The 2014 Asian Games began today (19 September) at South Korea’s Incheon Asiad Main Stadium with a colourful opening ceremony being staged at the 70,000-seat arena.

From now until 4 October, almost 10,000 athletes from 45 countries will compete in 439 events across 36 sports and disciplines.

Both the opening and closing ceremony, plus all of the athletics events, will be staged in the Incheon Asiad Main Stadium, which has been specially constructed for the Games.

Designed by international sports specialists Populous, in association with local firm Heerim Architects and Planners, the stadium is intended to illustrate a new level of sustainable design in Asian stadia. The multipurpose stadium will hold 70,000 people during the Games will reduce down to a single sided grandstand for 30,000 afterwards as a People’s Park for the city of Incheon.

Legacy and sustainability were the driving factors in designing the stadium in Incheon, according to Populous senior principal Andrew James.

“Rather than considering how we could shrink a 70,000 seat stadium, we turned the idea on its head and thought let’s build a 30,000 seat stadium and add 30,000 temporary seats,” he said.

“This approach provided multiple advantages. Financially, it reduced the building by two thirds meaning there are substantial savings in operational and maintenance costs. Secondly, it meant the permanent seats could be sited in the optimal position for these sports, in this instance, in the west stand.”

James stressed that the most important element of building a flexible stadium was to ensure there was plenty of scope to leave a legacy.

“The plans were always based on a community park, which after the Games, will replace the Eastern stand, providing atmospheric spectator viewing during a match, and a green space for the public to enjoy at all other times,” he added

“If the social legacy is achieved in the way it was originally planned, I think the world will sit up and notice that Korea is leading the way in delivering a sports’ project with a real defined legacy”.

To read a feature by Populous' John Barrow on the global trend towards temporary structures in sports stadia – from the 2012 Sports Handbook – click

here.

Sign up for FREE ezines

Company profile

Company profile: Taylor Made Designs
Taylor Made Designs offer health clubs a fully-managed end-to-end service. From garment design to sourcing, manufacture, storage & fulfilment, every step of the uniform creation process is taken care of
View full profile >
More company profiles

Featured Supplier

Reaching the people most gyms miss: Bedford Gym & Swim Campaign delivers 410 new members
One of the biggest mistakes the fitness industry still makes is advertising almost exclusively to people who already look and live like gym members.
View full details >
More featured suppliers

Property & Tenders

Location: Stratford, East London.
Company: Lee Valley Regional Park Authority
Location: Y Felinheli, LL56 4QN
Company: Newmark
Location: Newhaven, Sussex
Company: EiA Real Estate
Location: Tutbury Castle, Staffordshire
Company: Savills
Location: Oxford
Company: University of Oxford
More properties & tenders

Diary dates

13-13 Jun 2026
Worldwide, Various
21-24 Sep 2026
The Langham Huntington Pasadena , Pasadena, United States
06-08 Oct 2026
Messe Stuttgart, Stuttgart, Germany
22-22 Oct 2026
QEII Conference Centre, London
More diary dates