Final details unveiled for OMA’s New Museum expansion project
The Office for Metropolitan Architecture (OMA) have released images of their latest design for the New Museum of Contemporary Art expansion in Manhattan, New York.
Set to rise at 235 Bowery next to the recently completed SANAA-designed flagship, the future structure will more than double the museum's existing size, adding 937 sq m of exhibition space.
The architects’ intervention will also see the institution – the planning for which has been underway since May 2016 – gain an 80-cover restaurant, an artist-in-residence studio, a bookstore, a lobby, and a 75-seat auditorium.
In a statement, OMA said the estimated US$63m (€55.3m, £49.5m) annexe would “communicate the activities of the Museum outwards while creating a more inviting presence drawing the public inwards”.
OMA Partner Shohei Shigematsu explained: “We wanted to create a highly public face – starting from the exterior plaza and atrium stair to terraced multipurpose rooms at the top – that would be a conduit of art and activities, providing openness to engage Bowery and the city beyond.”
New York-based firm Cooper Robertson will serve as the Architect of Record, while ARUP will provide structural engineering oversight.
Construction is expected to be completed by 2022.
Leisure Centre Duty Manager
Leisure Supervisor (Development)
Recreation Assistant (Dry Site)
Party Leader
Cleaning Assistant
Duty Manager
Duty Manager
Team Leader (Harrow School Fitness Club)
Centre Manager (Leisure)
Director of Operations
Fitness Motivator
Recreation Assistant/Lifeguard (NPLQ required)
Membership Manager
Recreation Assistant
Swim Teacher
Swim Teacher
Chief Executive Officer, Mount Batten Centre
Swimming Teacher
Swimming Teacher
Company profile
Featured Supplier
Property & Tenders
Company: Knight Frank
Company: Belvoir Castle
Company: AVISON YOUNG
Company: London Borough of Bexley
Company: Forestry England