Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13969)           
UK only International

Houston's Holocaust Museum unveils US$33.8m expansion

By Tom Anstey    22 Jun 2017
Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record / Mucasey & Associates

Houston’s Holocaust Museum has announced plans to nearly triple in size following a US$15m (€13.5m, £11.8m) gift from longtime patrons Lester and Sue Smith.

The Smith’s donation goes towards the museum’s ongoing US$49.4m (€43.9m, £39.6m) capital fundraising campaign, which includes in addition to costs for the redevelopment, US$11.7m (€10.5m, £9.2m) in endowment funds.

Expanding in size to 57,000sq ft (5,300sq m), the US$33.8m (€30.3m, £26.6m) expansion will see two thirds of the existing building razed to the ground to make way for a new three-storey structure housing exhibits, classrooms, library space and administrative offices.

The first floor will contain the Human Rights Gallery, which will feature a new Interfaith Hall of Reflection. The gallery will also include a space for students to learn about human rights and genocide during the 20th and 21st centuries and a Call to Action exhibit, where visitors are challenged to engage with one another to understand the choices that a person can make to combat hatred. The first floor will also feature a permanent exhibit dedicated to Anne Frank and other youth diarists to educate visitors about the stories of the Holocaust.

The Moral Choices Hall on the second floor, will act as the “heart” of the museum, with programmes based on reminding visitors of the choices they remain free to make. The Moral Choices Hall also features the three-story Butterfly Loft, where butterflies symbolize the 1.5 million children who died during the Holocaust.

Also on on the second floor, The Samuel Bak Gallery and Learning Center will serve as a permanent collection of 129 of it namesake’s paintings, donated to the museum by the artist – a Holocaust survivor and painter. The floor will also be home to an expanded auditorium, which can seat 200 people.

The third floor is an expansion of the museum’s library, which will allow for enhanced public access to a collection of 285 oral testimonies for research purposes and genealogical searches. The library will also include more than 10,000 volumes and resources for in-house research and education.

"The expansion will give us the opportunity to serve substantially more students each year," said Dr. Kelly J. Zúñiga, museum CEO. "Expanded exhibits, complete with bilingual English/Spanish signage, will increase student field trip attendance by 50 per cent in the first year alone, and are projecting that our overall attendance will grow by nearly 35 per cent.”

Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record. Exhibition and media design will be handled by Ralph Appelbaum Associates. McCarthy Building Companies are general contractors.

During construction, which is scheduled to begin in October and be completed in early 2019, the museum will temporarily relocate most of its permanent exhibits. The museum will close on 24 July in preparation for the move to 9220 Kirby Drive, Suite 100, where it will open on 5 September.

The museum will expand to 57,000sq ft in size / Mucasey & Associates
The Butterfly Loft, symbolises the 1.5 million children who died during the Holocaust / Mucasey & Associates
Houston  Holocaust Museum  Human Rights Gallery  Holocaust  
Sign up for FREE ezines
Related news

Company profile

Company profile: Pulse Fitness
With an award-winning portfolio of over 450 pieces of cutting-edge, premium fitness equipment, Pulse Fitness is proud to expertly design, develop and manufacture its products in the UK.
View full profile >
More company profiles

Featured Supplier

Reaching the people most gyms miss: Bedford Gym & Swim Campaign delivers 410 new members
One of the biggest mistakes the fitness industry still makes is advertising almost exclusively to people who already look and live like gym members.
View full details >
More featured suppliers

Property & Tenders

Location: Stratford, East London.
Company: Lee Valley Regional Park Authority
Location: Y Felinheli, LL56 4QN
Company: Newmark
Location: Newhaven, Sussex
Company: EiA Real Estate
Location: Tutbury Castle, Staffordshire
Company: Savills
Location: Oxford
Company: University of Oxford
More properties & tenders

Diary dates

13-13 Jun 2026
Worldwide, Various
21-24 Sep 2026
The Langham Huntington Pasadena , Pasadena, United States
06-08 Oct 2026
Messe Stuttgart, Stuttgart, Germany
22-22 Oct 2026
QEII Conference Centre, London
More diary dates