Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13753)           
UK only International

Aquatics and sauna centre opens in Germany's Black Forest

By Kim Megson    26 Dec 2017
The centre includes a 25m swimming pool, a learners’ pool and a diving pool with two diving towers / Uwe Ditz
Large-surface glass façades, exposed concrete, wood, steel, subtly designed floor tiles and reduced colourfulness lend the interior a pleasantly calm atmosphere in harmony with the surrounding landscape
– 4a Architekten

Design studio 4a Architekten have completed an aquatics centre embedded into the landscape of the Offenburg Citizens’ Park in the south of Germany.

The design of the Stegermatt Centre is characterised by the interplay of architecture and landscape, with expansive roof surfaces, spacious glass façades and atmospheric spatial volumes interlocking with the natural surroundings to emphasise the contrast between the man-made and the natural.

The building is divided architecturally into three structures for recreation, sport and wellness. These dissolve towards the east and merge gently with the park landscape via the outdoor area. Intersecting roof surfaces are used as a public terrace with views of the landscape and the surrounding Black Forest.

Facilities include outdoor and indoor pools, a sauna area, a bathing garden and a large transparent two-storey entrance area that creates a landmark for the park.

The main bathing hall, located towards an adjacent street, is designed to welcomes visitors with its projecting roof. Inside there are three different zones for recreational swimming, competitive swimming and swimming lessons.

The first features a multipurpose pool with a flow channel, a children’s area and a tyre slide. In the sports area, there is a 25m swimming pool, a learners’ pool and a diving pool with two diving towers.

The teaching area is located between these two zones, separated by a glass wall, with a special pool with an elevating floor that provides variable water depths. The space is united by a curved wooden-strip ceiling which rises towards the landform in a gentle wave motion.

To the south of the complex, a free-standing block for the sauna area links with the building complex. Along with a steam bath, sauna cabins and brine inhalation, the sauna facilities also comprise a cold-water area with multi-sensory showers, a plunge pool along with a separate relaxation area, and an outdoor sauna in the extensive sauna gardens.

In a design statement about the project, 4a Architekten said: “Large-surface glass façades, exposed concrete, wood, steel, subtly designed floor tiles and reduced colourfulness lend the interior a pleasantly calm atmosphere in harmony with the surrounding landscape.

“On the exterior too, the aquatics centre gives way to nature: white metal cladding, white varnished wooden ceiling elements, white columns and a white outdoor slide combined with glass façades and wood-panelled façades ensure that the partly expressively designed volumes and levels appear restrained and light.”

/ Uwe Ditz
/ Uwe Ditz
Offenburg  Black Forest  architecture  design  Offenburg Citizens’ Park  Stegermatt Centre  4a Architekten 
Sign up for FREE ezines
Related news
Sports jobs

Sales, Marketing and Retention Manager

University of Leeds
Salary: £37,099 - £44,263pa + generous pension + benefits
Location: Leeds, UK

Exercise Referral Instructor

Everyone Active
Salary: Competitive
Location: Saltburn-by-the-Sea

Epping Forest Keeper (countryside Ranger)

City of London Corporation
Salary: £35,663 - £39,805pa + Local Govt Pension + benefits
Location: Loughton, UK

Aquatics Officer - dual site

Brio Leisure
Salary: from £29,269pa
Location: Northwich, UK

Fitness Manager

Everyone Active
Salary:
Location: Bristol

Climbing Activities and Wellbeing Coordinator

Everyone Active
Salary:
Location: Winchester

Strategic Manager Leisure Partnerships and Health

Swansea Council
Salary: £53,653 – £58,089pa
Location: Swansea, UK

Centre Manager - dual site

Brio Leisure
Salary:  £35,745pa + excellent benefits
Location: Ellesmere Port, UK

Centre Manager - dual site

Brio Leisure
Salary: £35,745pa + excellent benefits
Location: Chester, UK
recruiting with sports management

Activity & Wellbeing Leader

Everyone Active
Salary:
Location: Stratford-upon-Avon

Chief Executive Officer

Redbridge Sports & Leisure
Salary: on request
Location: Barkingside, Ilford, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Rickmansworth, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Watford, UK
Swimming Teacher jobs  duty manager jobs  Team Leader jobs  Swim Manager jobs  general manager jobs  recreation assistant jobs 
More jobs

Company profile

Company profile: IndigoFitness
At IndigoFitness, we're not just about providing equipment; we're about delivering exceptional training spaces. We understand that each fitness facility is unique, requiring tailored solutions for optimal performance. We’ve gained invaluable experience over almost 30 years, working with hundreds of gyms of all shapes and sizes, in a range of different industries.
View full profile >
More company profiles

Featured Supplier

Explosion of passion for fitness at RiminiWellness 2024 and record success for Panatta
The passion for fitness and bodybuilding reached new heights at the Panatta stands during RiminiWellness (30 May – 2 June 20204) – the largest fitness event in Italy – which this year exceeded the 100,000 visitor mark.
View full details >
More featured suppliers

Property & Tenders

Location: Cleveland Lakes, Wiltshire and Gloucestershire
Company: Cotswold Lakes Trust
Location: Loughton, IG10
Company: Knight Frank
Location: Grantham, Leicestershire
Company: Belvoir Castle
Location: Hall Place House, Bexley, DA5 1PQ
Company: London Borough of Bexley
Location: 15 Concessions across the nation's forests
Company: Forestry England
More properties & tenders

Diary dates

03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
08-10 Sep 2024
Wyndham® Lake Buena Vista Disney Springs™ Resort, Lake Buena Vista, United States
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
20-22 Sep 2024
Locations worldwide,
More diary dates