Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13742)           
UK only International

Stretch of LA river famous from Terminator 2 to be revitalised by Perkins+Will

By Kim Megson    29 Mar 2018
Perkins+Will have worked with the County of Los Angeles, Tetra Tech Engineers and the LA River Working Group to create the Lower Los Angeles River Revitalization Plan / Perkins+Will
This is a real opportunity to take a huge open space resource – that right now is pretty much off-limits – and transform it into a canvas for the community to express the issues that are important to them
– Martin Leitner, design leader at Perkins+Will's LA office

Plans to revitalise a 19-mile strech of the Lower LA River have been revealed, with new renderings showing how desolate concrete stretches – famously providing the dystopian backdrop to Terminator 2 – could be transformed into vibrant community hubs.

Architecture firm Perkins+Will have worked with the County of Los Angeles, Tetra Tech Engineers and the LA River Working Group – formed of 13 stakeholder communities – to create the Lower Los Angeles River Revitalization Plan (LLARRP) – a “realistic” proposal for the stretch of river between Vernon to Long Beach.

Unlike several other proposals that have outlined High Line-like green-filled trail infrastructure, the LLARRP sets out how incremental alterations to the concrete channel and its banks can more feasibly and effectively reduce flood risk and transform the basin into a “healthy, equitable, and sustainable” community.

“The Lower LA River runs through the southeast county where, by and large, there has been a lot less investment into public spaces and infrastructure and where incomes are generally lower,” Martin Leitner, urban design leader at Perkins+Will's LA office, told CLADglobal. “It also suffers from a huge amount of pollution from the port and shipping.

“As such, this project is a real opportunity to take a huge open space resource – that right now is pretty much off-limits – and transform it into a canvas and a playing field for the community to express the issues that are important to them.

“It’s 19 miles long and, 600ft wide at points, so instead of designing every single piece we have created a toolbox to address certain issues.”

Leitner said that over 80 community and stakeholder meetings have been held; a process which led to the creation of three signature design templates for infrastructure improvements and three signature projects for open space sites.

“We have to work within the parameters of the engineering, what is possible and how to reduce flood risk,” he said. “We can widen and narrow the low-flow channel to accelerate the water flow and intentionally allow it to spill onto the concrete in places, creating types of habitat there, but predominantly our plan is about embracing the existing channel, adding amenities and shade and making incremental modifications that allow people to use the top of the levy, come down and cross to the other side.

“We’ve planned bridges that would bring people, cyclists and horse riders together, separating them from car and truck traffic and creating spaces for art, meetings and events. It’s about creating a cultural and active spine for these neighbourhoods and a continuous high-quality experience, which eventually leads to the stretch of river where it becomes much wider and you get a greater amount of flora and fauna and a more typically bucolic scene.”

The City County of Los Angeles is seeking to revitalise whole stretches of the 51 mile LA River, providing new recreation and open space while also maintaining flood protection and safety, with Frank Gehry and landscape architect Laurie Olin working on an updated county-wide masterplan, building upon the City of Los Angeles’ 2007 River Revitalization Master Plan and the LLARRP.

Last year, local architects Gruen Associates were commissioned by the City to design 12 miles of the LA River Greenway from Canoga Park to Elysian Valley with “a next-generation, LA-specific design aesthetic.”

The greenway design must also include shade elements, stormwater capture features and habitat areas for local wildlife, as well as fencing, gates, lighting, signage and additional educational and interpretive elements.

The plan aims to reduce flood risk and turn the basin into a 'healthy, equitable, and sustainable' community / Perkins+Will
Unlike several other proposals that have outlined High Line-like green-filled trail infrastructure, the LLARRP sets out how incremental alterations to the concrete channel and its banks can be more impactful / Perkins+Will
The Lower LA River famously featured in Terminator 2 / YouTube
Lower LA River  Los Angeles  Perkins+Will  County of Los Angeles  Tetra Tech Engineers  LA River Working Group  LARRP  Martin leitner  Frank Gehry 
Sign up for FREE ezines
Related news
Sports jobs

Recreation Assistant (Dry Site)

Everyone Active
Salary: Competitive
Location: Market Rasen

Party Leader

Everyone Active
Salary: Competitive
Location: Gainsborough

Cleaning Assistant

Everyone Active
Salary: Competitive pay rates
Location: Gainsborough

Duty Manager

Everyone Active
Salary: Competitive
Location: Gainsborough

Duty Manager

The Pickaquoy Centre
Salary: £30,000pa + local Govt pension + attractive benefits package
Location: Kirkwall, UK

Team Leader (Harrow School Fitness Club)

Harrow School
Salary: £13.71 per hour
Location: Harrow on the Hill, Harrow, UK

Centre Manager (Leisure)

Exeter City Council
Salary: £40,221 - £42,403pa + pension + benefits
Location: Exeter, UK

Director of Operations

Active Luton
Salary: £61,000 - £64,000 + exceptional pension + excellent benefits
Location: Luton, UK

Fitness Motivator

Everyone Active
Salary: Competitive
Location: Lutterworth
recruiting with sports management

Recreation Assistant/Lifeguard (NPLQ required)

Everyone Active
Salary: 9.50 ph
Location: Lutterworth

Membership Manager

University of Warwick
Salary: £29,605 - £32,982pa + pension + benefits
Location: Coventry, UK

Recreation Assistant

Everyone Active
Salary: Competitive salary
Location: Wigston

Swim Teacher

Everyone Active
Salary: Competitive
Location: Shipston-on-Stour

Swim Teacher

Everyone Active
Salary: Competitive
Location: Shipston-on-Stour

Chief Executive Officer, Mount Batten Centre

Mount Batten Group
Salary: c£65,000pa + pension + benefits
Location: Plymouth, UK

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Rickmansworth, UK
recruiting with sports management

Swimming Teacher

Everyone Active
Salary: Competitive rates of pay
Location: Watford, UK
Swimming Teacher jobs  duty manager jobs  Team Leader jobs  recreation assistant jobs  Swim Manager jobs  general manager jobs 
More jobs

Company profile

Company profile: Pulse Fitness
With an award-winning portfolio of over 450 pieces of cutting-edge, premium fitness equipment, Pulse Fitness is unique in its position as the only company to research, design, develop and build technologically advanced equipment in the UK.
View full profile >
More company profiles

Featured Supplier

Sibec EMEA to blend fitness with luxury at Fairmont Monte Carlo
Experience the pinnacle of fitness and luxury at the premier industry event, Sibec EMEA, set against the breathtaking backdrop of the Fairmont Monte Carlo this Autumn.
View full details >
More featured suppliers

Property & Tenders

Location: Loughton, IG10
Company: Knight Frank
Location: Grantham, Leicestershire
Company: Belvoir Castle
Location: Verwood, Dorset
Company: AVISON YOUNG
Location: Hall Place House, Bexley, DA5 1PQ
Company: London Borough of Bexley
Location: 15 Concessions across the nation's forests
Company: Forestry England
More properties & tenders

Diary dates

10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
08-08 Jun 2024
Worldwide, Various
More diary dates