Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13985)           
UK only International

Rio's Olympic Park will leave a lasting legacy, says AECOM's Bill Hanway

By Kim Megson    11 Aug 2016
AECOM masterplanned Rio's Barra Olympic Park / Robb Williamson
One of the key issues we carried on from London was that we didn’t want to be in a position where we had arenas and venues which were abandoned after the Games
– Bill Hanway
Credit: AECOM

The architect behind the Rio 2016 Olympic Park masterplan has revealed how a focus on sustainable design and temporary venues has created a lasting legacy for the Brazilian city.

Bill Hanway, executive vice president at AECOM, has worked with the international practice to masterplan Olympic parks for both the Rio Games and the London Olympics four years earlier.

In an exclusive interview, he told Sports Management how this time round there has been an enhanced focus on ensuring the facilities have a life after the world’s athletes have headed home.

“One of the key issues we carried on from London was that we didn’t want to be in a position where we had arenas and venues which were abandoned after the Games – or had a capacity which was in excess of what was required,” he said. “We didn’t want a repeat of some of the problems faced by previous Games.

“In London, it meant that we had a number of temporary venues. The Rio mayor wanted us to take that concept of temporary one step further. So instead of just thinking about venues which could be demounted, moved to an alternative location and rebuilt in that same form, he wanted to see whether we could design these temporary venues in modular parts – in order to take them apart and then reuse them in an entirely different way.”

This strategy has been one of the most successful architectural innovations of the Games in Rio. Notable examples are the Future Arena for handball – designed by Oficina de Arquitetos and local practice Lopes, Santos & Ferreira Gomes – which will be dismantled after the event. Material from the building will be used to build four state schools.

In a similar vein, the Olympics Aquatic Stadium will be disassembled after the Olympics and rebuilt as two public pools elsewhere in the city. Meanwhile six venues from the Olympic Park will be utilised as a new Olympic Training Centre.

Hanway described himself as “particularly proud” of how effectively architects have adopted an approach to temporary architecture. He said the question of how to create a lasting legacy for the facilities has occupied AECOM for over a decade.

“We won the international competition for Rio in in the middle of 2005 when we were still heavily involved in the London planning,” he said. “We had confidence in our methodology and approach for London, which we thought was relevant as a starting point for the conversation at Rio.

“When we were working on the London plans, we were always drawing a transition masterplan and a legacy masterplan at the same time to ensure all of our work [between the two Games] overlapped.

“We used that same approach when it came to starting the conversations about the Rio bid, so legacy was very much part of our early planning process.”

The full interview with Bill Hanway, and an outline of all the facilities being used at the Rio Olympics can be read in the latest issue of Sports Management.

AECOM have been working on the masterplan since 2005 / Robb Williamson
The largest facility in the Barra Olympic Park is WilkinsonEyre’s Arenas Cariocas / WilkinsonEyre
The Arenas Cariocas is hosting several Olympic competitions, including basketball, judo, wrestling, taekwondo and fencing / Robb Williamson
Rio Olympics  Rio de Janeiro  AECOM  Barra Olympic Park  Bill Hanway  legacy  design  architecture  masterplan 
Sign up for FREE ezines
Related news
Sports jobs

General Manager

Everyone Active
Salary:
Location: Sheffield

General Manager

Everyone Active
Salary:
Location: Sheffield

Swim Manager

Everyone Active
Salary: Competitive salary
Location: Stratford-upon-Avon

Membership Advisor

Everyone Active
Salary: Competitive salary plus commission & benefits
Location: Harborough

Sports Coach

Everyone Active
Salary: £20.00 - £25.00
Location: Hemel Hempstead

Sports Coach

Everyone Active
Salary: £20.00 - £25.00
Location: Berkhamsted

Swim Teacher

Everyone Active
Salary: Competitive
Location: Scarborough

Party Leader

Everyone Active
Salary: Competitive
Location: Scarborough

Group Exercise Instructor - Aqua

Everyone Active
Salary: Competitive
Location: Aldershot
recruiting with sports management

Membership Advisor

Everyone Active
Salary: Competitive salary plus commission & benefits
Location: Aldershot

Swim Teacher

Everyone Active
Salary: Competitive
Location: Bristol

Swim Teacher

Everyone Active
Salary: Competitive
Location: Stratford-upon-Avon

Activity and Wellbeing Instructor

Everyone Active
Salary: Competitive
Location: Stratford-upon-Avon

Operations Manager - Brentwood School Enterprises

Brentwood School Sports Centre
Salary: £32,000 - £34,000pa + pension + benefits
Location: Brentwood

Swim Teacher

Everyone Active
Salary: Competitive
Location: Fareham

GP Exercise Referral Instructor

Everyone Active
Salary: £33,000pa + benefits
Location: Harrow
recruiting with sports management

Duty Manager

Everyone Active
Salary: Competitive
Location: Bedminster
Swimming Teacher jobs  duty manager jobs  Team Leader jobs  Swim Manager jobs  general manager jobs  recreation assistant jobs 
More jobs

Company profile

Company profile: ukactive
ukactive is the UK’s leading trade body for the physical activity sector, bringing together more than 4,000 member organisations and partners in our shared ambition to get More People, More Active, More Often.
View full profile >
More company profiles

Featured Supplier

Cornerstone Connect helps Active Blackpool tackle health inequalities
Active Blackpool is deploying Cornerstone Connect, a new digital interface allowing disparate information from multiple systems to be aggregated into one dataset, to support its focus on reducing health inequalities and improving healthy life expectancy.
View full details >
More featured suppliers

Property & Tenders

Location: Stratford, East London.
Company: Lee Valley Regional Park Authority
Location: Y Felinheli, LL56 4QN
Company: Newmark
Location: Newhaven, Sussex
Company: EiA Real Estate
Location: Tutbury Castle, Staffordshire
Company: Savills
Location: Oxford
Company: University of Oxford
More properties & tenders

Diary dates

21-24 Sep 2026
The Langham Huntington Pasadena , Pasadena, United States
06-08 Oct 2026
Messe Stuttgart, Stuttgart, Germany
22-22 Oct 2026
QEII Conference Centre, London
26-29 Oct 2027
Koelnmesse Exhibition Centre, Cologne, Germany
More diary dates