Job search
Job Search
Latest news
More news: (showing 1 - 20 of 13969)           
UK only International

Australia's first museum unveils AU$285m redevelopment masterplan

By Tom Anstey    15 Dec 2016
The expansion would allow the museum to display 20 per cent of its collection of 18 million items – up from the current 1 per cent

Sydney’s Australian Museum has unveiled a AU$285m(US$214m, €201m, £168.6m) masterplan proposing a new multi-storey extension to stretch over the top of its existing building in the largest redevelopment in the institution’s 189-year history.

The Barrabuwari Muru (future path) masterplan by Hames Sharley places a new extension in the museum’s eastern quarter, an area currently taking up a car park and storage facility.

The 2,700sq m (29,000sq ft) extension and wider redevelopment will more than triple museum floorspace, up from 6,500sq m to 20,000sq m, allowing the museum to exhibit as much of 20 per cent of its 18 million-strong collection of artefacts – an increase from the current 1 per cent.

The new masterplan envisages a great hall at the site’s centre. Created by removing existing buildings between heritage-listed parts of the museum, the 70 metre-long hall could accommodate up to 2,000 people at one time.

A large new space for temporary exhibitions would also be created, “allowing Sydney to compete on the global stage” in terms of international blockbusters.

In preparation for the masterplan, the museum has commenced an extensive transformation programme to upgrade existing facilities including its Crystal Hall opened last year; a new First Australians Gallery featuring two new permanent exhibitions; the Pacific Spirit Gallery; a new rooftop restaurant; and the restoration of the Long Gallery – Australia’s first museum gallery – reopening as the Westpac Long Gallery in late 2017.

In addition to a reimagining of the existing space, the museum will create new education and community facilities, including new learning spaces, a theatre, an Indigenous and Pacific cultural centre and new DNA labs.

The masterplan has been submitted to the NSW Government for consideration as part of the State Cultural Infrastructure Strategy. An architect for the project is yet to be appointed. The museum – originally designed in 1857 by architect Mortimer Lewis – is planning to hold a international design competition for the new building held over two stages. Once approved, the museum is planning to start construction on the new building in 2018m with the extension to be open by 2022.

The Barrabuwari Muru (future path) masterplan by Hames Sharley places a new extension in the museum’s eastern quarter
The 2,700sq m (29,000sq ft) extension and wider redevelopment will more than triple museum floorspace
The new masterplan envisages a great hall at the site’s centre
The masterplan has been submitted to the NSW Government for consideration as part of the State Cultural Infrastructure Strategy
Australian Museum  Australia  Museum  visitor attraction  Hames Sharley  museum  gallery 
Sign up for FREE ezines
Related news

Company profile

Company profile: PSLT Ltd
PSLT offer a range of new and refurbished fitness equipment being the UK supplier of DHZ equipment and the SPLAN Fitness Mirror, in addition we offer maintenance, repair and on site upholstery service nationwide, with a network of engineers in fully equipped vans to enable a first time fix wherever possible.
View full profile >
More company profiles

Featured Supplier

W3Fit EMEA celebrates its fifth anniversary
Celebrating its milestone 5th anniversary, W3Fit EMEA returns in 2026 with an unmissable gathering of the Health & Fitness industry’s most influential leaders.
View full details >
More featured suppliers

Property & Tenders

Location: Stratford, East London.
Company: Lee Valley Regional Park Authority
Location: Y Felinheli, LL56 4QN
Company: Newmark
Location: Newhaven, Sussex
Company: EiA Real Estate
Location: Tutbury Castle, Staffordshire
Company: Savills
Location: Oxford
Company: University of Oxford
More properties & tenders

Diary dates

13-13 Jun 2026
Worldwide, Various
21-24 Sep 2026
The Langham Huntington Pasadena , Pasadena, United States
06-08 Oct 2026
Messe Stuttgart, Stuttgart, Germany
22-22 Oct 2026
QEII Conference Centre, London
More diary dates